Skip to content
Milan and its province · Switzerland, from Chiasso to Lugano Opening hours: Monday to Friday, 8.00 am to 8.00 pm +39 393 376 0456
Service · Fire protection

Fire protection systems in Milan and its province.

Installation, upgrading and servicing of fire protection systems on condominium buildings, offices, retail units and industrial sites.

Fire protection pressure-boosting set: flanged manifold, pressure gauges, valves and galvanised pipework in a plant room.
Fire protection pressure-boosting set, plant room.
What we do

From new systems to scheduled servicing

This is the part of the work on which a property manager or a site officer gets the most questions and has the least room to improvise. It is also where one supplier covering both plumbing and fire protection avoids two firms passing responsibility back and forth on the same building.

  • Hydrant networks and cabinets, from the main run to the outlets
  • Pressure-boosting sets and fire water supply
  • Upgrading of existing systems in buildings still in use
  • Scheduled servicing and breakdown call-outs
  • Making good the masonry and finishes after the works

Which buildings

Condominium buildings and common areas · offices and retail · industrial sites and warehouses · car parks and plant rooms.

When to call us

A system never upgraded after refurbishment · parts to replace after an inspection · a servicing date to schedule · a new building or a change of use.

Qualification on the register

This area falls under letter G of Ministerial Decree 37/2008, fire protection systems, entered with no restriction in the companies register of the Milan Monza Brianza Lodi Chamber of Commerce in the name of Impiantistica Generale Soc. Coop., the company of the group that carries out the systems work. Technical requirements verified on 8 June 2016.

Cover and compliance

What a client checks before entrusting a job

DM 37/2008 qualifications

Letters C, D, E and G: heating and ventilation, water and sanitary systems, gas, fire protection. Entered on the register in the name of Impiantistica Generale Soc. Coop., a company of the group. Technical requirements verified by the Milan Chamber of Commerce in 2016.

Certified social-contribution compliance

Valid DURC certificate with INPS and INAIL, supplied on request before work starts.

Generali public liability cover

One million euros of third-party cover per claim. No claims declared over the past five years.

Work at height

Access by scaffold and by rope. A façade, a riser or a rooftop flue stays reachable without a platform lift.

How it works

Four steps, from the survey to the handover of documents

01

Site survey

Inspection of the existing system, of the components installed and of the constraints of the building.

02

Written quotation

Materials and labour shown separately, each item of work listed, timescales stated.

03

Execution

A single site contact, with the making-good works coordinated.

04

Handover

Job report and the documentation required, handed to the client.

Frequently asked questions

What we are asked most often

Will you work on a system installed by someone else?

Yes. The site survey starts from the existing system: current condition, parts to be replaced, works required for the upgrade.

Do you handle scheduled servicing?

Yes, under a programme covering one building or a portfolio. The schedule follows the dates set by the system.

Do you make good the masonry afterwards?

Yes. Finishing work is part of what the group does: the system and the reinstatement are handled on the same job.

Do you work with property managers?

That is the main part of the work on residential buildings. The dedicated page sets out how it works: site survey, quotation for the meeting of owners, and completion documents.

Which municipalities do you cover?

Milan and the municipalities of its province, with a travel surcharge beyond the municipalities covered. The company also works in Switzerland, from Chiasso to Lugano.

Enquiry

Tell us about the system, we will arrange a site survey

Who is writing
Optional for private clients.
Step 1 of 3
The building and the system
Street and municipality. Used to assess travel and survey lead time.

Step 2 of 3

The enquiry

Step 3 of 3

A fire protection system that needs checking?

The site survey starts from the existing system, even if someone else installed it.